Tianshengqiao I (TSQ-1) CFRD is 178m high, an extra high dam in the world. A large of voids appeared between the face slab and the cushion layer and additionally many cracks occurred at face slab of the dam.
Welcome to the HydrOu World
1 On Shuibuya CFRD
- Details
The 233m high Shuibuya CFRD has passed its 6 years trouble-free operation It is more than 15 years for the Chinese dam builders to research and conduct this type of extra high CFRD. Here now
5 Overflow technology for CFRDs
- Details
Overflow technology for CFRDs
Here shows the state of art technilogy for crest overflow CFRDs in China in titles and themes selected from HydrOu Libraries.Contact Mr. Zou at
This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
" if you are interested in their full texts.
Key Technologies CFRD Construction in China (Book)
- Details
The book is written based on the successful construction of the Shuibuya CFRD after its 7 years trouble-free operation as the successful experiences for CFRD construction.
Considerations on the Seismic Design of High Concrete Face Rockfill Dams
- Details
The height of Concrete Face Rockfill Dams (CFRDs) has been steadily increasing during the past forty years. During this period the height of CFRDs have increased from 110m (Cethana, Australia, 1971) to 233m (Shuibuya, China, 2008)
Bakun Dam – Some Design and Construction Challenges
- Details
The high rainfall, averaging about 4,500mm per annum; the unique ridge-and-gully topography; beddings of hard greywacke and relatively soft shale geology of the site pose some serious challenges to the design and construction of the 203m high Bakun CFRD.
Total Risk of Concrete-Faced Rockfill Dams in Turkey
- Details
The authors point out the fact that it is necessary to have more attention about plinth construction, foundation preparation, rockfill selection and placement,